Munster Joinery, Wellesbourne, UK

PROJECT LOCATION: Munster Joinery, Wellesbourne, UK

PROJECT DATE: September 2018-Present

Project Details

This project involved all site clearance, excavation and removal of 26000m3 of excess material, laying 22500m2 of reinforced concrete with K-form joints. We also installed ducting, cabling, lighting, security cameras, fire main and valves/hydrants and other services. The drainage to this area was done using channels, twinwall pipework, attenuation tanks and discharged through a pump chamber to the local authority drainage network.

Phase 3A Factory Extension

This project is for the completion of a 5000m2 extension to the existing factory. We are carrying out the extension including steel framework, cladding, brickwork and blockwork, reinforced concrete flooring, precast concrete stairs and floors, mechanical and electrical installation including sprinkler system, syphonic drainage, compressed air, heating installation and associated internal drainage.