McFadden Civils delivered a major water infrastructure upgrade for Cork city, installing approximately 9.5km of trunk primary ranging from 600mm to 1000mm in diameter. Works also included two new pumping stations, telemetry control systems and a 30m trenchless crossing of the River Lee. The upgraded trunk main supports future population growth and improves long-term network resilience for Cork’s water supply.

Brief Description

Sector: Utilities

Location: Cork, Ireland

Role: Civils Contractor

Scope of Works

  • Installed 9.5km of trunk watermain (600–1000mm diameter)
  • Constructed two strategically located pumping stations
  • 30m River Lee crossing delivered by trenchless technology
  • Installed advanced control and telemetry infrastructure
  • Integrated network smoothly with live supply system