As part of the Kilgallioch Wind Farm development in South Ayrshire, McFadden Civils delivered the civils package for 25 turbines, including extensive access road construction, turbine hardstandings, substation works and grid connection infrastructure. The works ensured the efficient delivery of one of Scotland’s biggest renewable energy projects.

Brief Description
Sector: Utilities
Location: Stirling, Scotland, UK
Role: Civils Contractor
Scope of Works
- Installed 6.5km of upgraded watermain (38–315mm diameter)
- Worked across roadways, footpaths & landscaped university grounds
- Directional drilling, slip-lining & pipe-bursting methods applied
- Maintained full live water service throughout construction
- Reinstated all impacted surfaces to original standard