McFadden Civils has been delivering utility works under the Uisce Éireann framework since 2019, operating across the North West of Ireland as a subcontractor to Farrans. This ongoing programme focuses on the upgrade and installation of critical water infrastructure across multiple locations.

The works involve the installation of water mains using modern trenchless techniques, including directional drilling and pipe bursting. Pipe diameters typically range from 90mm to 315mm, allowing efficient installation while minimising disruption to surrounding communities and existing services.
A key challenge across the framework is variable ground conditions and unknown existing utilities. These are managed through detailed planning and the use of specialist methods such as vacuum excavation to safely locate and expose services before installation.

McFadden Civils delivers a full end-to-end service, including excavation, installation, and full reinstatement of water mains. This mobile and ongoing programme requires flexibility and strong coordination, with each project delivered to high standards of safety, quality, and efficiency.

Brief Description

Sector: Utilities

Client: Uisce Éireann (Irish Water)

Framework Partner: Farrans Construction

Location: North West Ireland

Role: Utilities Subcontractor

Scope of Works

  • Installation of water mains using trenchless techniques, including directional drilling and pipe bursting
  • Open-cut excavation where required
  • Use of vacuum excavation for safe service location and exposure
  • Installation of pipework ranging from 90mm to 315mm diameter
  • Management of variable ground conditions and constrained environments
  • Full reinstatement of surfaces following completion of works
  • Ongoing coordination with the main contractor and client to meet programme and safety requirements