Mynyndd Y Gwair Windfarm, South Wales, UK
Mynyndd Y Gwair Windfarm, South Wales, UK
PROJECT LOCATION: Mynyndd Y Gwair Windfarm, South Wales, UK
WINDFARM OPERATOR: Innogy
PROJECT SIZE: 16 Turbines
PROJECT DATE: February 2018 – April 2019
Project Details
Our works included the construction of 3km of enabling works entrance road from existing public road continuing through agricultural fields to the windfarm workface.
Constructing a total of approx 10km of access roads through the entire windfarm connecting all turbines. Excavation of 16 number turbine bases, hardstandings, blade pads and all associated drainage works such as clean and dirty water ditches, silt fencing and road crossings. Trenching and ducting works around each turbine base was also completed.