PROJECT LOCATION: Cork, Ireland

PROJECT DATE: May 2021 – July 2022

Project Details

Circa 9.5km of Trunk Main ranging in diameter 600mm – 1000mm between Cork City Centre heading West towards the N40 / N22 Junction South of Ballincollig

2 no. water pumping stations at the Shanakiel Reservoir site and the green area east of the Harbour View Reservoir, and associated control and telemetry Works.

30m Crossing of the River Lee between the Lee Fields and University College Cork Environmental Research Institute by trenchless methods.

The client, Irish Water, requires a full rehabilitation of the supply to city of Cork to replace the current aging system and accommodate expansion of the City

McFaddens are doing approx. 2.5km of 600mm water mains and all associated tie ins, hydrants etc.